On Tuesday, November 10th at approximately 1339 hours, Ulster Hose was dispatched to a possible structure fire in their first due in the Glenerie area. Command arrived on scene and upgraded the assignment to a “working fire,” putting Glasco’s FASTeam on the road and moving Centerville-Cedar Grove to UHFD headquarters. After the arrival of initial Ulster Hose units, the incident was upgraded to a second alarm, bringing Centerville’s FASTeam to the scene, and putting Port Ewen and Rhinebeck on standby at headquarters, and Ruby at UHFD Station 2. The fire was knocked down rapidly by interior crews, with two lines in operation. The incident was caused by a dryer combusting and starting a fire that began traveling down a hallway before a quick stop by crews. Units were back in service by 1550 hours.